Chapter 108 Your news is a bit behind schedule
"Who is it?"
"Who's looking for me?"
Su Ren half sat up and turned to look at the person who spoke.
A humanoid creature dressed in black appeared there, holding a black steel pipe.
[Dark King Stir (Demon of the Abyss)]
[Level: 700]
[Physical Attack: 480000]
[Magic Attack: 550000]
[HP: 48000000]
[Physical defense/magic defense: 600000/570000]
[Skills: Immortal Thundercloud, Lightning Storm, Overlord, Speed Reduction Field, Steel Pipe Smash]
[Description: One of the four great demons under the King of Evil, extremely difficult to deal with! ]
"Su Ren, I have been looking for you for a long time. Today, I, Steele, will kill you!"
"The evil king's men?"
Su Ren was confused for a moment.
It had been a month since he had provoked the King of Evil.
Why did this guy find me only now?
Doesn't look very smart...
"good!"
Steele said with some disdain:
"I see you are not very old, how could the Lord of Evil personally order you to be killed?"
"Your only instant kill skill is nothing but a joke in front of me!"
After saying this, Steele jumped up and turned into a dark thundercloud in the air.
“Hahaha, now that I have turned into an immortal thundercloud, you can prepare to die now!”
Su Ren's head was filled with black lines. It was okay for this guy to just talk to himself, but the key point was where did his confidence come from?
Su Ren had to remind him:
"Um...I don't mean to say that, but are you a little behind on the news?"
"I don't know what you're talking about, die!"
As soon as Steele finished speaking, he discovered that an ice dragon next to him had already drilled into his thundercloud.
"Huh? What's inside me!?"
Steele panicked for a moment, and then a bolt of lightning struck him.
"-3200!"
"What are you doing? Are you tickling your brother Long?"
Steele was stunned to see that this was the only damage.
" What's going on? Who are you?"
"I'm your Grandpa Long!"
The Ice Dragon King didn't waste any time talking to it. He flew out of the thundercloud and exhaled a breath of freezing air. The entire thundercloud was directly frozen into ice.
Even if the Ice Dragon King doesn't take action, Su Ren can control it with his River God skills.
The ice cubes fell to the ground with a thud.
Still had some strength. He forced himself back into human form and broke free from the ice.
However, as soon as it broke free, it found that it was surrounded by pets, staring at it with unfriendly expressions.
"Are you touched?"
Suren looked at it with a smile.
“You…you…”
Steele no longer had the arrogance he had just now, and was left with only trembling and fear.
It feels like every living thing around here can hurt it.
"That's not right. Didn't the Lord of Evil say that Su Ren was just relying on his one-shot kill skill to do whatever he wanted?"
"Can anyone tell me what the hell these things are?"
"Lord King of Evil, you are harming me!!"
Steele was roaring inwardly.
It found that it had been deceived and it was not at all what the Evil King said.
" No, I can't die here!"
Steele looked at Suren and decided to pretend to surrender.
"thump!"
Steele knelt down directly.
"I surrender!"
"I, Steele, am willing to be your slave and serve you for life!"
The Ice Dragon King was immediately unhappy.
"Boy, are you trying to grab the position from your Grandpa Long? He's my master!"
"Huh? Where did this stupid thing come from? Why are you trying to rob him?"
"When I return to the abyss, I will make the Lord of Evil avenge me!"
In his heart, Still madly despised the Ice Dragon King and was thinking about his future revenge.
It didn't even realize that it had been caught by Su Ren twice.
Since it wants to be a slave, Su Ren must of course meet its requirements.
However, Su Ren was naturally worried about making a verbal request.
The safest way is of course to use the beast hunting skill.
Seeing that Su Ren just stared at it without saying anything, Steele felt a little strange.
"What is this human doing?"
Before Steele could figure it out, he felt dizzy and the next moment, he felt a shaking sensation.
Then it was pulled into a strange space.
Looking around, Steele was shocked.
"Where am I?"
"Welcome, Steele."
Su Ren's voice echoed in the space.
"Still greets the master!"
Still didn't know why, but there was no longer any thought of loyalty to the evil king in his heart.
Now it is loyal only to Suren.
The reason why Su Ren didn't kill it wasn't because he was impressed by its abilities.
This Still is also a monster with a certain status in the abyss, and Su Ren will be able to use it when he goes to the abyss in the future.
It can be regarded as paving the way for going to the abyss in the future.
Without looking at it anymore, Su Ren rested for an hour and then started another round of skill upgrading training.
Of course, you have to kill a couple of monsters to level up along the way.
The level of the poisonous tail giant scorpion is much higher than Su Ren, so after a few days.
Su Ren's level has been upgraded from 2nd Transformation Level 0 to 2nd Transformation Level 100.
Upgrading is a time-consuming and labor-intensive task for others, but it is the easiest thing for Su Ren.
Just find a group of high-level monsters and kill them instantly, and your level will jump up quickly.
There is absolutely no difficulty at all.
On the contrary, each job transfer task is more time-consuming.
[Your level has reached the 3rd job transfer requirement. Please go to the Awakening Temple to accept the job transfer task.]
After taking a look at the prompt, Su Ren remained unmoved and continued to improve his skill proficiency.
[100% chance of being caught with bare hands (30000/30000)]
[Upgraded to a proficient 100% bare-handed catching skill]
“Upgraded!”
Su Ren was silently thinking of a chair in the house where he used to live in Donghai City.
Then all the scenes of Donghai City appeared in Su Ren’s mind.
Everything is so familiar, everything is so vivid.
It was as if Su Ren had returned to Donghai City.
Before the scene ends, Suren glances at the people in the orphanage.
Xiong Da was playing games with the children, and the old dean and others were happily chatting together.
all is well.
The scene faded, and the chair that Su Ren used before traveled through space and appeared under Su Ren's blade.
Looking at this familiar chair, Su Ren smiled slightly, took it and sat on it.
Su Ren has already witnessed the power of this skill of catching a sword with bare hands.
After a short rest, Su Ren began to practice his hole-drilling skills.
[Drilling a hole (30000/30000)]
[Upgraded to a skilled hole driller! 】
"Everyone is back, let's go back to the city!"
Su Ren recalled all his pets.
Then he waved his hand in front of him, and a circular wormhole more than one person tall appeared in front of Su Ren.
Su Ren stepped in, and at the same time, a wormhole appeared next to the Awakening Temple in the Far West City.
"What is this?"
When someone passed by here, they stared in amazement at the black hole that suddenly appeared in front of them.
"Shit, is this an invasion from the Abyss?!"
"Go and call the governor!"
As soon as the man finished shouting, Su Ren walked out.